Vestas Videos

1,212 views March 20, 2012
Proven Technology

The 2 MW-Class has more than 9700 turbines installed, making it the world’s most proven turbine.

2,108 views March 20, 2012
Lost Production Factor

The 2 MW-Class has an average Lost Production Factor no one in the industry can match – just 1.8%

2,412 views March 14, 2012
Testing the chemistry of blades

A small laboratory in Denmark puts the chemicals which go into Vestas’ blades to the test. Watch a short video demonstrating just how science is con...

10,898 views November 08, 2011
V112-3.0 MW shipped to Macarthur project in...

Vestas' first full scale produced V112-3.0 MW turbines have been loaded on to a ship, set for the long journey to the 420 MW Macarthur project in Aust...

4,029 views August 24, 2011
Project Planning

Project siting is critical to optimising production. Site Assessment models evaluate the likely performance in both stable and unstable wind flows.

1,787 views August 24, 2011
AOM 1000-3000

The AOM 1000, 2000 and 3000 service concepts offer different levels of service commitment.

12,731 views August 24, 2011
Verification

In addition to validating the product design, verification testing is about examining the degree of compliance with customer expectations.

1,451 views August 24, 2011
AOM 4000

The AOM 4000 service concept provides maximum uptime and increased performance.

4,334 views August 24, 2011
Vestas Test Centre

In the Vestas Test Centre, real life conditions are replicated to subject designs to harsh tests.

11,486 views August 24, 2011
AOM 5000

The AOM 5000 service concept is a full scope contract with no risk of unforeseen maintenance costs.

1,899 views August 24, 2011
AOM Introduction

Vestas' Active Output Management concept ensures optimal service and maintenance.

7,614 views August 24, 2011
V100-1.8 MW

The V100-1.8 MW is optimised for onshore sites with low wind.