Vestas Videos
Verification
In addition to validating the product design, verification testing is about examining the degree of compliance with customer expectations.
Vestas Test Centre
In the Vestas Test Centre, real life conditions are replicated to subject designs to harsh tests.
AOM Introduction
Vestas' Active Output Management concept ensures optimal service and maintenance.
V100-1.8 MW
The V100-1.8 MW is optimised for onshore sites with low wind.
Safety & Citizenship
Vestas pays much attention to safety for all employees as well as green energy and the environment.
Product Development Process
The four aspects of the Vestas Product Development Process are to identify, design, optimise, and verify.
Cost of Energy
Vestas' commitment is to drive down the cost per kilowatt-hour produced.
Vestas - when reality exceeds imagination
The dramatic story of Vestas. The series begins in 1898 and ends in March 2006 when Ditlev Engel is about to present his first annual report as CEO of...
How Horns Reef was built
Video from 2002 showing how Horns Reef was built.
Oldest offshore turbines still in flawless...
Ten turbines at Tunoe Knob in Denmark mark the very beginning of the offshore era in Vestas. Built in 1995, they are the oldest Vestas turbines locate...